August 5, 2006
The permits are pulled and the plans have been engineered by Gene Unger, P.E.
The plan is for four 2.1kWh trackers. The system will have 48 175 watt panels
and two SMA SunnyBoy 6kW Grid-tie inverters.
Finishing the conduit and foundation: (Click to enlarge)
The grid-tie unit is mounted under the deck. This conduit will carry the DC circuits and low voltage for the X-Y positioner motors. |
||
|
Passed all inspections, waiting to pour